GRANITE
COUNTERTOP
When you choose Toronto Cabinet's Granite Bathroom and
Kitchen Countertop's, we
will help you create the kitchen of your dreams - with natural stone countertops, islands, flooring and exclusive
backsplashes. Remodeling your bathroom? Let us custom fabricate your
vanities in either granite or
marble. Or perhaps you are
looking for something exceptional such as solid stone shower walls or a
magnificent tub surround. We can help you do it all!
We take the hassle out
of remodeling. You work with one company from start to finish.
No matter how unique you want
your home to be, we at torontocabinet.com are here to help. When you
are ready to move forward with your kitchen
remodeling project, email or fax the scope of the project to us. We
will generate a Free Kitchen
Estimate for you and email back
in 24 - 48 hours. All
other estimates will be provided within 7 daysstomize your
cabinets and drawers with knobs, pulls, hinges and more.
We offer hardware to suit your taste, whether you prefer simple looks
or more ornate designs.
Granite
countertop installation
When we arrive for templating, we ask that you have cleared your
countertops and keep the work area free of any objects. This will help
us to finish the template efficiently, and will also protect your items
from any dust or damage. Templates usually take a couple of hours.
In the templating process, we make a pattern of your cabinets. During
this phase:
- All sinks/cooktops/faucets are checked for compatibility and fit
(therefore all such units must be on-site at template).
- Cabinets are reviewed for any additional adjustments
required, as best can be determined.
- Overhang, general support and any personal preferences are
discussed. Any refinements needed to cabinetry, etc., which will be
required prior to installation of your countertops will be discussed
with you.
- Seam placement will be discussed.
Sink:
During installation, your undermount sink(s), if applicable, will be
mounted under your stone. We ask that you do not plumb in or use the
sink in any way for at least 12 hours. Please keep this in mind when
scheduling your plumber to reconnect the water and drain. Also,
cooktops and faucets, etc. will be dropped into place for confirmation
of fit.
Project Information:
Below is a list of information we will ask for prior to the production
process. We prefer to obtain all of this information/material at time
of templating or very soon after.
- Sinks (we will bring undermount sinks back to the shop)
- Faucet make and model and placement
- Cooktop/Range make and model; cutout dimensions; downdraft when
applicable
- Edge preference
Granite Fabrication:
Prior to fabrication, we encourage you to approve your slabs. We will
ask that you review and give final approval of the Post Template
Checklist. If your drawing submitted for your quote differs from your
actual job we will let you know at this time and adjust the price up or
down accordingly.
Existing Kitchen
Counters:
If your project requires that we tear out and remove your existing
countertops, we will do so at time of installation.
We will also disconnect your plumbing at time of tear out, so be sure
not to use your dishwasher until your plumber has reconnected the water.
Granite Counter
Installation:
At installation, we ask that you also clear the work area of any
objects and clear a path for the installers to carry the granite. The
installation phase can take the better part of a day;
and can require some final cutouts to be made in your home. Please keep
in mind that this is a major remodeling job, there may be some residual
dust over the next couple of days, be sure to check items left in
cabinets. We recommend the drawers be removed. Items under cooktop and
sink cabinet must be removed to allow access. Some dust can result even
though our installers are equipped to catch the majority of it.
Granite, if not resin coated, is sealed at time of installation.
Job Completion:
Your inspection of the finished job is very important. The
lead installer will review the installation with you, answer any
questions you may have and ask for payment of the final balance due for
your project. You will also be given a bottle of cleaner to get you
started with proper care of your granite.
Keywords:Design granite countertop granite countertop installation
granite countertop pictures cleaning granite countertop how to install
granite countertop
granite countertop gallery granite countertop repair black granite
countertop granite countertop edge