discount kitchen countertops        toronto granite kitchen counter


Make your home and kitchen look it's best
Affordable Bathroom and  Kitchen  Granite Countertops


toronto cabinet - granite kitchen countertop
3410 Midland Ave.Unit 16 Scarborough, Ontario M1V 4V4
Sales Person: Cathy Pang
Tel: 416-833-8084  e-mail: torontocabinet@hotmail.com
We Design and Manufacture Granite Kitchen Countertops --  located in Toronto 

   Toronto Granite Kitchen counter  - discount kitchen reno 's
 
We offer a vast selection so you'll have your pick of styles, colors, materials and finishes.

 GRANITE  COUNTERTOP
When you choose Toronto Cabinet's Granite Bathroom and Kitchen Countertop's, we will help you create the kitchen of your dreams - with natural stone countertops, islands, flooring and exclusive backsplashes. Remodeling your bathroom? Let us custom fabricate your vanities in either granite or marble. Or perhaps you are looking for something exceptional such as solid stone shower walls or a magnificent tub surround. We can help you do it all!
We take the hassle out of remodeling. You work with one company from start to finish.
No matter how unique you want your home to be, we at torontocabinet.com are here to help. When you are ready to move forward with your kitchen remodeling project, email or fax the scope of the project to us. We will generate a Free Kitchen Estimate for you and email back in 24 - 48 hours. All other estimates will be provided within 7 daysstomize your cabinets and drawers with knobs, pulls, hinges and more. We offer hardware to suit your taste, whether you prefer simple looks or more ornate designs.


 

 Granite countertop installation

When we arrive for templating, we ask that you have cleared your countertops and keep the work area free of any objects. This will help us to finish the template efficiently, and will also protect your items from any dust or damage. Templates usually take a couple of hours.
In the templating process, we make a pattern of your cabinets. During this phase:
  • All sinks/cooktops/faucets are checked for compatibility and fit (therefore all such units must be on-site at template).
  • Cabinets are reviewed for any additional  adjustments required, as best can be determined.
  • Overhang, general support and any personal preferences are discussed. Any refinements needed to cabinetry, etc., which will be required prior to installation of your countertops will be discussed with you.
  • Seam placement will be discussed.

Sink:
During installation, your undermount sink(s), if applicable, will be mounted under your stone. We ask that you do not plumb in or use the sink in any way for at least 12 hours. Please keep this in mind when scheduling your plumber to reconnect the water and drain. Also, cooktops and faucets, etc. will be dropped into place for confirmation of fit.

Project Information:
Below is a list of information we will ask for prior to the production process. We prefer to obtain all of this information/material at time of templating or very soon after.

  • Sinks (we will bring undermount sinks back to the shop)
  • Faucet make and model and placement
  • Cooktop/Range make and model; cutout dimensions; downdraft when applicable
  • Edge preference

Granite Fabrication:
Prior to fabrication, we encourage you to approve your slabs. We will ask that you review and give final approval of the Post Template Checklist. If your drawing submitted for your quote differs from your actual job we will let you know at this time and adjust the price up or down accordingly.

Existing Kitchen Counters:
If your project requires that we tear out and remove your existing countertops, we will do so at time of installation. We will also disconnect your plumbing at time of tear out, so be sure not to use your dishwasher until your plumber has reconnected the water.

Granite Counter Installation:
At installation, we ask that you also clear the work area of any objects and clear a path for the installers to carry the granite. The installation phase can take the better part of a day; and can require some final cutouts to be made in your home. Please keep in mind that this is a major remodeling job, there may be some residual dust over the next couple of days, be sure to check items left in cabinets. We recommend the drawers be removed. Items under cooktop and sink cabinet must be removed to allow access. Some dust can result even though our installers are equipped to catch the majority of it. Granite, if not resin coated, is sealed at time of installation.

Job Completion:
Your inspection of the finished job is very important. The lead installer will review the installation with you, answer any questions you may have and ask for payment of the final balance due for your project. You will also be given a bottle of cleaner to get you started with proper care of your granite.
Keywords:Design granite countertop granite countertop installation granite countertop pictures cleaning granite countertop how to install granite countertop granite countertop gallery granite countertop repair black granite countertop granite countertop edge

 

 

Sites by:gtatorontobusiness.com

Business Signs | Toronto signs | Toronto Sign Company | plastic signs | vinyl letter sign toronto | vinyl banner sign toronto | sign boxes | vinyl banner canopy sign | toronto awning signs | vinyl plastic letters sign



Toronto Granite countertop